Serving every side of Aurora: Arapahoe, Adams and Douglas County

Asphalt shingle covers most of Aurora, but not all of it. Concrete tile went on many of the upscale builds of the 1990s and 2000s, especially in southeast Aurora's golf and master-planned communities, and metal keeps gaining ground with homeowners who are tired of re-roofing every hail cycle. Both systems behave differently from shingle in Colorado weather, and both carry inspection wrinkles worth knowing before you commit.

Concrete Tile Roofs in Aurora

Tile earns its keep here: it shrugs off UV that cooks asphalt at altitude, it handles the 40 psf snow design load with ease when the structure was built for it, and large hail that would total a shingle roof often only cracks a repairable number of tiles. The catch is weight and workmanship. Tile systems live or die on their underlayment and flashing, because the tile is the armor, not the waterproofing. Aurora's ice barrier requirement applies underneath tile the same as shingle, and tile roof work is exactly the kind of system where mid-roof inspections can be required, checked partway through installation rather than only at the end. We schedule that with the city so the job never stalls.

Tile repair vs. tile replacement

Cracked and slipped tiles, worn underlayment at valleys, and failed penetrations are all repairable without replacing a tile field that may have decades left. If your tile roof is from the 1990s, odds are decent the tile is fine and the underlayment is due. That is a re-lay: lift, re-paper, re-set, at a fraction of full replacement cost. Matching discontinued tile profiles takes legwork; we source reclaimed stock when the profile is out of production, and the hunt starts before any tile comes off so the roof is never open while the supply question gets answered.

Metal Roofing in Aurora

Metal's pitch in a hail market is simple: Class 4 rated systems, 50-year service life, and snow that slides instead of piling. Standing seam, with concealed fasteners, is the premium option and the one we recommend for full-home applications; exposed-fastener panels have their place on outbuildings and patio structures but bring a maintenance schedule of gasket checks that most homeowners never keep, which is how a cheap metal roof becomes a leaky metal roof by year twelve. One honest caveat for a hail town: metal resists puncture, but large hail can cosmetically dent panels, and many policies exclude cosmetic metal damage. We walk you through that exclusion before you buy, not after your first claim surprise.

What tile and metal cost here

SystemRelative cost vs. architectural shingleBest fit
Concrete tile re-lay (existing tile)Comparable to premium shingle1990s tile homes with sound tile, tired underlayment
New concrete tile2 to 3 timesStructures engineered for tile weight
Standing seam metal2.5 to 3.5 timesLong-hold owners, hail fatigue, modern builds
Stone-coated steel2 to 3 timesTile look without tile weight

Multipliers, not quotes; roof complexity and structure drive the real number, and we bid tile and metal only after measuring and checking what the framing was designed to carry.

Which System Belongs On Your Aurora Home?

  • Keep tile if you have it and the structure carries it; re-lay when the underlayment ages out.
  • Go metal if you plan to stay 15 plus years and want off the hail replacement cycle, with the cosmetic-exclusion conversation had honestly up front.
  • Class 4 shingle remains the value play for most homes: impact rating and insurance discounts at a fraction of metal's cost.

Stone-Coated Steel: the Tile Look Without the Tile Weight

The fourth lane deserves its own paragraph, because it solves a specifically Aurora problem. Plenty of 1990s tile-look lovers own homes whose framing was never engineered for concrete tile, and plenty of tile owners facing a re-lay wonder whether they should carry that weight for another cycle. Stone-coated steel panels read as tile from the street at a fraction of the weight, carry Class 4 impact ratings, and shed the 40 psf design snow load without the structural conversation. The trade-offs are honest ones: the panel look reads slightly different up close, hail can still mark the granular coating, and the cosmetic-exclusion question applies just as it does to standing seam. Where it wins is the house that wants the tile aesthetic without the engineering bill, and we say so when that is the house we are standing on, with the structural question answered before the aesthetic one gets asked.

Hail Claims on Tile and Metal Roofs in Aurora

Premium materials change the claim conversation, usually in ways the first adjuster scope underplays. Tile damage hides at corners, edges and in cracks that read as “wear” to an adjuster who mostly works shingle; our documentation photographs each break against its impact pattern, with the storm date matched to the record, so the distinction between weathering and hail holds up. Underlayment matters twice: a hail event that cracks a meaningful share of tiles has usually also bruised the membrane beneath, and a scope that pays for tile swaps over dead underlayment is a scope that funds a future leak. Metal claims turn on the cosmetic-damage exclusion; dents that do not breach the panel may not be covered if your policy carries the endorsement, which is a paragraph to read before you buy the roof, not during the claim. On every premium-roof claim we reconcile the scope against Aurora's code items, ice barrier included, exactly as we do on shingle.

How We Run Tile and Metal Projects in Aurora

Premium systems get a premium process, which mostly means more scheduling discipline, not more drama. Mid-roof inspections, which the city can require on tile, metal, stone-coated steel and low-slope systems, get scheduled with the Building Division as part of the production calendar, so the job never stalls waiting on an inspector with the roof open. Reclaimed tile sourcing for discontinued profiles starts before tear-off, not after, because matching is a supply hunt and the roof should not sit in paper while we run it. Landscaping and hardscape protection gets planned for the extra staging weight tile work brings. And the closeout folder carries the paperwork this tier deserves: permit record, mid-roof and final inspection sign-offs, material documentation for any Class 4 rating, and the photo file your insurer or your next buyer will eventually ask for. It is the least glamorous half of premium roofing and the half that protects the investment. Ten years from now, the folder is the only crew member still on the property, and at this tier the next buyer’s agent will ask for it by name: what is on the roof, who approved it, when it was inspected, and what warranty follows the house.

Tile or metal question?

We inspect, measure and give you real numbers for each option. Call (720) 729-9514 or book an inspection.

Hail season does not wait. Get your Aurora roof inspected before the next storm.